HET banner
Home Problem Reports Operations Schedule Operations Calendar Weather Data Archive

HET Operations Engineering Manual
28 Sept 2004 Martin L. Villareal

Contents
HTML
WORD
Outline
Checklist
Checklist Details
Enclosure Thermal Control
Air System startup
Glycol Startup
Interior Visual Inspection
Exterior Visual Inspection
Jove startup
PMC System startup
Sams Startup
Guide Cameras
Mars/Hefi Startup
PFIP Startup
Reset Sps
Test Calscreen
Fif Startup
Tcs and Tracker Startup
Check Weather
Dome Gui Startup
Open Dome/Shutter

3 Nov 2003 New Quick Start Guide from Mike Soukup: HTML or Word format

20 May 2002 Teddy R. George

Contents
HTML
WORD
Quick Start Up List
PMC System (Jove) startup
Dome Chiller Startup and Monitoring
Air Startup
Exterior Visual Inspection
Glycol Startup
Interior Visual Inspection
Operational Tests – Dome Rotation and Dome Shutter
Operational Tests – Cameras and PFIP Slide
TCS and Tracker Initialization
SAMS Startup and Calscreen Check
Open Dome

Created:   2-May-2002
Last updated: 03-Nov-2003

Send comments to: webmaster@het.as.utexas.edu
Copyright © 2002, 2003  The University of Texas at Austin, McDonald Observatory