Procedures |
Date |
Author |
HTML |
Word |
Rho Encoder Tape Cleaning |
1 Mar 2007 |
George Damm |
-- |
|
Varian Cary 100 Spectrophotometer |
3 Aug 2004 |
Carol Carveth |
-- |
|
Revised Struct Lim Switch Repl 8/2019 |
3 Aug 2019 |
George Damm |
|
|
Structure Limit Switch Replacement |
3 Aug 2004 |
George Damm |
|
|
Operations Engineering Manual |
26 Feb 2003 |
Teddy George |
|
|
Air System Operations Rev 3 |
02 Feb 2001 |
John Vause |
|
|
Tracker Y roller-screw bearing/net Replacement |
24 Apr 2002 |
David Doss |
|
-- |
Tracker Y slew Motor Replacement |
07 Aug 1999 |
|
|
|
Primary Mirror CO2 Cleaning |
17 Sep 2002 |
Jim Fowler |
|
-- |
Primary Mirror Reflectivity Measurement |
22 Oct 2002 |
Richard Schuler |
|
|
SAC Reflectivity Measurement |
22 Oct 2002 |
Richard Schuler |
|
|
SAC CO2 Cleaning |
22 Oct 2002 |
Richard Schuler |
|
|
FIF Removal/ Installation |
19 Sep 2002 |
Jim Fowler |
|
-- |
Pistoning Primary
Mirror |
5 Aug 2002 |
Jim Fowler |
|
|
Cable Length Diagram |
2000 |
Teddy George |
|
-- |