HET banner
Home Problem Reports Operations Schedule Operations Calendar Weather Data Archive

Policies & Procedures
Procedures
Date
Author
HTML
Word
Rho Encoder Tape Cleaning 1 Mar 2007 George Damm
--
Varian Cary 100 Spectrophotometer 3 Aug 2004 Carol Carveth
--
Revised Struct Lim Switch Repl 8/2019 3 Aug 2019 George Damm
Structure Limit Switch Replacement 3 Aug 2004 George Damm
Operations Engineering Manual 26 Feb 2003 Teddy George
Air System Operations Rev 3 02 Feb 2001 John Vause
Tracker Y roller-screw bearing/net Replacement 24 Apr 2002 David Doss
--
Tracker Y slew Motor Replacement 07 Aug 1999  
Primary Mirror CO2 Cleaning 17 Sep 2002 Jim Fowler
--
Primary Mirror Reflectivity Measurement 22 Oct 2002 Richard Schuler
SAC Reflectivity Measurement 22 Oct 2002 Richard Schuler
SAC CO2 Cleaning 22 Oct 2002 Richard Schuler
FIF Removal/ Installation 19 Sep 2002 Jim Fowler
--
Pistoning Primary Mirror 5 Aug 2002 Jim Fowler
Cable Length Diagram 2000 Teddy George
--

Procedure Template


Created:   2-May-2002
Last updated: 01-Nov-2005

Send comments to: webmaster@het.as.utexas.edu
Copyright © 2002, 2003  The University of Texas at Austin, McDonald Observatory