Ops Checklist Details version 2004.5
Revised 01Sept.2004
Enclosure Thermal Control (afternoon ops )
1. Log into jove as guider
2. (3-3) open WXGui's &
Netscape, check weather and AccuWeather swag
a) Monitor the dome T vs.
outside T and try keep them close by typing “ahu temp #” in the smoke xterm on
monitor 1.
i.
By keeping the temperature of the dome and truss approximately the same
as the outside T, the
initial stack of the night is much easier and has a better chance of lasting
longer if temperatures are relatively stable when we open and are ready to
stack.
b) The following websites are
helpful in determining whether to open:
i.
On Netscape, we have bookmarked on the toolbar:
1. “Current
2. “NWS Doppler
Radar…Midland/Odessa, TX”
3. “HET Observing Support Page”
3. update temperature in dome
on smoke window to 2C less than SWAG
System Checkout (evening Ops)
1.
Check that chiller is on. If it is off, open smoke window and type jcon.
This will bring chiller
online
2. large air
compressor: oil level, power on, test panel lights, start, check oil flow
a) rotate the red knob counter
clockwise in order to be able to start the compressor
b) test panel lights on
operating panel
c) push and hold compressor button
until compressor has fired up completely
d) on top of the large metal
filter case to the left of the operating panel, check to see if oil is flowing
by looking into the sight glass of the pipe (flashlight may be needed).
Generally a small oil flow is observed.
3.
dryer: open large dryer valve, power on dryer
e) once the gauge on the
compressor operating panel has reached 750kpa, slowly raise the yellow valve handle (dryer valve)
f) once dryer valve is completely
in the “open” position (perpendicular to the floor), push the black button on
the dryer control panel to actuate dryer cycle.
Warning: A sudden blow down will
occur. There will be a loud rush of air
blowing by your feet. Protect eyes and ears if you are standing
close to
the dryer.
4. glycol startup: start, gauge
at 8 GPM
a) in the control room, go to the
electrical room; just inside the door to your right, there is a box labeled
“GPD/515”. Push the blue button that
says “Run”.
b) After a few minutes, at the
bottom of the control room cabinet, the little red light should go out next to
the green label “Loss of Air and/or Glycol”.
This occurs when the gauge right next to it with a yellow label “glycol
flow gpm” reaches ~5
The standard flow rate should stay at 8gpm. This
ensures glycol flow to the
tracker.
5. inspect interior: be on the
lookout for any glycol drops due to a leak, sweep pier
6. inspect exterior: glycol
pump and tank, ahu's, chillers
7. Open smoke
a) Open smoke xterm from the
pulldown menu and type “startwork” at prompt.
b) Two windows will appear:
Primary Mirror User Interface
Primary Mirror Control System
8. (1-2) open SAMS Server and
GUI, set reference, go to operate
a) from desktop menu, select
SAMS>Sams Server. Wait until the
GUI’s Status bar at the bottom says “Running Main Application Loop” before next
step.
b) from desktop menu, select
SAMS>Start SAMS GUI
c) Set current reference; Make sure loop is open.
d) After a minute, on SAMS GUI,
click Operate and another GUI will appear.
e) Ensure that no errors appear
on the “SAMS Server” GUI in the boxed sections titled “Errors Encountered” and
“Bad Sensors”. See the detailed Ops Eng
Manual for what to do in the case that errors are
encounted (which usually happens after a few minutes).
9. (2-1) open Dome GUI, open
roof vents and home dome on GUI
a) from desktop menu, click
Dome>Start Dome GUI
b) on toolbar of GUI, click
Dome>Home Dome and wait until done homing.
c) Move the dome to west (for
daysky) for when you’re ready to open; do this by clicking Dome>Move
To>West.
d) Verify operation of the Dome
Vents on toolbar of Dome GUI; open vents by clicking System->Vents->Open. Close the vents again if it is not yet time
to open.
**Guiders
may be opened by selecting Guiders from the popup WorkSpace Menu. Important note: Be sure to run the same
version number for both the LRS and HRS guiders.
Open LRS PXL before
HRS.
10. (2-2) open "LRS PXL
Guider” as first of all guiders and check camera
a) via desktop menu, click
Guiders>LRS PXL guider
b) from the toolbar, click
Expose>Set>0.1
c) again, click Expose and then
select single.
d) This is a check to make sure
the camera is working, so it’s important to notice whether or not an image
appears after the exposure has read out.
11. (2-3) open "HRS PXL
Guider” and check camera
a) via desktop menu, click
Guiders>HRS PXL guider
b) from the toolbar, click
Expose>Set>0.1
c) again, click Expose and then
select single.
d) This is a check to make sure
the camera is working, so it’s important to notice whether or not an image
appears after the exposure has read out.
12. (2-4) open “HRS Apogee
Guider” and check camera
a) via desktop menu, click
Guiders>HRS Apogee Guider
b) from the toolbar, click
Expose>Set>0.1
c) again, click Expose and then
select single.
d) This is a check to make sure
the camera is working, so it’s important to notice whether or not an image
appears after the exposure has read out.
13. (3-2) start MARS-HEFI
system, turn Wavescope power on, open HEFI interface and HEFI light source GUIs
via desktop pulldown menu
a) from desktop menu, click
Mars-Hefi>Start Mars-Hefi System
i.
on the GUI labeled “MARS GUI”, about ¾ of the way
down, click the ON button next to the word Wavescope.
ii.
Make note of the axis positions (x,y,f) and
then click the green button next to Home, labeled “ALL”. Once the axes are homed, put the positions
back to where they were.
b) From desktop menu, click
Mars-Hefi>HEFI Light Source
c) From desktop menu,click
Mars-Hefi>HEFI Interface
i.
On this GUI, type “m” to ensure mirror is inserting and retracting
fully. After you’ve typed “m” and hit
Enter, there should be a message
saying “Mirror Status: inserted (or retracted)”.
14. open baffle xterm, check
translation slide
a) log into a baffle xterm as
guider
b) at baffle% prompt type
‘trans z’
c) type ‘trans @#’ where the #
is 1,2,3, or 4, and hit Enter
d) type trans z again and verify
that the current slot position is at the correct # that you’ve just typed in.
e) repeat steps c and d while moving
to a different position.
f) Important: Leave translation slide in position 4 for daysky observations.
15. reset SPS system
a) To view SPS GUI on the
Frijole monitor, press button #3 on the KVM Switches panel on the cabinet
underneath the large monitor.
b) if the SPS program is running,
close it by selecting File->Exit.
c) Restart SPS by
double-clicking the latest version of the SPS desktop icon.
16. check calscreen
a) In the cabinet that is beneath the suspended monitor,
there is a box with the label “Calibration Screen Switch” and switch it from
Out to In and then back to Out, listening for the movement of the screen. A visual confirmation of the calscreen moving
in and out is possible by viewing channel 1 on the large
monitor.
b) Important: Leave calscreen out for day sky
observations
17. open FIF/PMT GUI, home
HRS/MOS probes, then set HRS probe 242,000 and watch its motion on channel 3 of
TV; when done, ensure lamps/camera are off (**while moving, click continue, not abort!)
a)
On KVM Switch #2,
on the “frijole” monitor, open the “shortcut to FIF Gui” icon.
b)
Click on the
white arrow in the upper left corner of the Gui to
start the software, and wait for the message center to say “Initialization is
Complete”.
c)
Click the “ON”
buttons (green) that say “LB1”, “LB2”, and “CB” (upper left Gui).
d)
Turn to Channel 3
on the large monitor and you should
see the fiber arms of FIF.
e)
On the toolbar,
Click “Movement”, and then click on “Stow/Home HRS”. (**while
moving the probes, you will get an error message. Just press continue. Do NOT press abort!)
You must wait until it is completely done homing before you attempt to click
anything else (except “continue” on the error message Gui). Once HRS is done homing (green light goes
out), click “Stow/Home MOS A”; again, do not click anything else in the Gui until the probe is done homing (green light goes out).
If the
HRS
probe is already in the home position, then the homing
procedure should be
instantaneous. The same goes for the MOS A probe.
f)
Type 242,000 in
the “HRS Probe Position” box and click the green “Start” button under “HRS
Probe”.
g)
Click position
update to be sure the value gets to ~242,000 and check visually on monitor for
stopped motion.
h) Now that both probes are homed and the HRS probe is
moved to the correct position, click off on the “LB1” and “LB2” and click the red
button labelled “Both Cameras Off”.
18. (4-1) open PMAC & Hexapod State
Monitor, Crockett Tss, power up tracker, Tcs GUI
a) from desktop menu, click
TCS-Crockett>PMAC State Monitor
b) from desktop menu, click
TCS-Crockett>Hexapod State Monitor
c) next from menu, click
TCS-Crockett>Crockett-tss
i.
in this window, type ‘tss’ at prompt
ii.
wait for message that says to power up the tracker
iii.
on the cabinet, push the button labeled “Tracker Power On” Be
sure to check the LED panel in
the cabinet. Check that the Hex
limits and the Amp faults on the
X-Y Status are green. If any
are lit as red these must be
tended to before the tracker can be moved.
Beam Skew LEDs should clear after the tracker is
started. Otherwise,
There may be no glycol flow.
iv.
then click enter in the tss GUI
d) from pulldown menu, select
TCS-Crockett>TCS GUI
19. enable structure, initialize,
track, initialize search
a) when the TCS GUI appears,
there will be a small GUI in front of it
i.
“Just take charge” and “Enable Structure Automation” should
be the default
selections. Confirm then press Enter.
b) On the TCS GUI toolbar,
click Tools>Tracker Position
i.
Without changing any numbers, just click OK.
ii.
A new little GUI will appear.
Select Track and at this point, the tracker brakes will release
c) Next from the toolbar,
select Tools>Initialize… and click on the Initialize Search button.
i.
This is done to ensure that the tracker initializes properly.
ii.
Ensure proper rho initialization on channel 1 of the monitor
20. check weather: Mt Fowlkes
& Locke GUI's, Netscape, visually
a) This is done right before
you open for the night.
21. open dome, CCAS shutter,
louvers, roof vents; jcoff
a) Do a jcoff from jove.
b) On dome GUI, click
Shutter>Open Shutter
c)On the louver control box inside the dome, make
sure the switch is set to Master instead of
Individual and push the button next to it that says Master Open
d)**Before this step, it’s good
to feather the louvers individually (to keep sun from shining in on mirror) to
equilibrate the temperatures inside and outside of the dome. If you’ve done this, the jcoff
command should have already been issued.
e) In the
smoke xterm, type jcoff
f) Open roof
vents as described in 7d.
22. make sure dome lights are
off, go to incandescents in the control room
23. ensure unneeded lights
around HET are off (i.e. GTAG, basement, UER, KHut)
24. fill out the Ops Checklist