pending |
Category for faulty PRs |
GNATS administrator (gnats-admin) |
sams |
Segment Alignment Maintenance System |
Jim Fowler (Jim) |
mars |
Mirror Alignment Recovery System |
Jim Fowler (Jim) |
sps |
Segment Positioning System |
Jim Fowler (Jim) |
pmc |
Primary Mirror Control |
Jim Fowler (Jim) |
tcs |
Telescope Control System |
Jim Fowler (Jim) |
pfip |
Prime Focus Instrument Package |
Jim Fowler (Jim) |
ccas |
Center of Curvature Alignment System |
Jim Fowler (Jim) |
mcs |
Master Control System |
Jim Fowler (Jim) |
lrs |
Low Resolution Spectrograph |
Jim Fowler (Jim) |
hrs |
High Resolution Spectrograph |
Jim Fowler (Jim) |
mrs |
Medium Resolution Spectrograph |
Jim Fowler (Jim) |
ufoe |
Upgraded Fiber Optic Echelle |
Jim Fowler (Jim) |
enclosure |
Telescope Dome/Shutter/Glycol system |
Jim Fowler (Jim) |
structure |
Telescope Azimuth System |
Jim Fowler (Jim) |
ecs |
Environment/Facility Control System |
Jim Fowler (Jim) |
tracker |
Tracker Sub System |
Jim Fowler (Jim) |
doc |
Documentation |
Jim Fowler (Jim) |
site |
Site Problems |
Jim Fowler (Jim) |
guider |
Guide/Acquisition Cameras |
Jim Fowler (Jim) |
general |
Any other problems |
Jim Fowler (Jim) |
test |
*Test Category |
GNATS administrator
(gnats-admin) |