Changes between Version 12 and Version 13 of HetProcedures/TO/pvtwilight


Ignore:
Timestamp:
Dec 21, 2018 10:20:00 PM (5 years ago)
Author:
ccrowe
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • HetProcedures/TO/pvtwilight

    v12 v13  
    55* Open dome shutter, Louvers should be left closed
    66* Retract ACAM mirror if deployed, then deploy PV/CWFS mirror, set CWFS/PV position to PV
    7 * Uncheck the "Store Images" box on PV camera (So that images are not saving while the exposure time is being figured out)
     7* Change the filter to 'Blue' and uncheck the "Store Images" box on PV camera (So that images are not saving while the exposure time is being figured out)
    88* Start Pipeline and images on PV camera
    99* Adjust exposure time till the "Blue" PV image flux for the mirror segments is approximately 190 counts
    1010* Turn PV pipeline off, leave start images on and run command '~/justen/pvtwilightOnSph' in a terminal on jove
    1111* Watch "Blue" images as they come out to see what the flux is, if the flux drops below 150 or hits 255 adjust exposure while tracker is moving to the next position
     12* When the terminal prompts "Done" then it's finished taking the PV images. Once it does this, send an email to mirror@het.as.utexas.edu and CC Justen saying that the images are done.
     13
    1214'''NOTE: If any image has flux of 255(over-exposed) or is below 150(under-exposed), another set will need to be taken'''
     15'''The whole process should take about 13-15 minutes'''
    1316
    1417== On sphere locations for HS PV test==