Changes between Version 84 and Version 85 of HetProcedures/VAC


Ignore:
Timestamp:
Oct 22, 2019 5:58:50 PM (5 years ago)
Author:
sir
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • HetProcedures/VAC

    v84 v85  
    4343|| 20191011 || V330                      || 8.5  || 50  ||
    4444|| 20191017 || V410, V412                 || 9.0  || 53  ||
     45|| 20191022 || V413, V414, V330          || 9 (V413), 6  || 65 (V413), 48 ||
    4546
    4647
     
    6263Turn on the Cd-A and Hg lamps through the TCS gui[[BR]]
    6364{{{ ipvg off -V }}}[[BR]]
     65{{{ countdowns 780 }}} [[br]]
    6466Cd-A test exp {{{ vlcal -i virus --binning 1x1 -l cd-a -L 1 -bexp 20 -o 6101 -skip_warmup -B }}}[[BR]]
    6567Re-Turn on the Cd-A lamp and calculate the correct exposure time for the VIRUS unit of interest to get 50k peak.[[BR]]