Changes between Version 85 and Version 86 of HetProcedures/VAC


Ignore:
Timestamp:
Oct 22, 2019 7:37:55 PM (5 years ago)
Author:
sir
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • HetProcedures/VAC

    v85 v86  
    6161Try the following for faster work:
    6262
    63 Turn on the Cd-A and Hg lamps through the TCS gui[[BR]]
     63Turn on the Cd-A and Hg lamps through the TCS gui
     64
    6465{{{ ipvg off -V }}}[[BR]]
    65 {{{ countdowns 780 }}} [[br]]
     66{{{ countdowns 780 }}}
     67
    6668Cd-A test exp {{{ vlcal -i virus --binning 1x1 -l cd-a -L 1 -bexp 20 -o 6101 -skip_warmup -B }}}[[BR]]
    6769Re-Turn on the Cd-A lamp and calculate the correct exposure time for the VIRUS unit of interest to get 50k peak.[[BR]]