Changes between Version 40 and Version 41 of NightOperations/TOProjects
- Timestamp:
- Oct 8, 2018 12:55:58 AM (6 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/TOProjects
v40 v41 6 6 [[BR]] 7 7 8 == Chevo ==8 {{{#!== Chevo == 9 9 - Optics Team laptop and SCS hardware interface - ongoing. 10 10 - CCAS POV camera project - ongoing. … … 21 21 - Remote activate and control DIMM louvers and Shutter. 22 22 - Remote control Dome enclosure Louvers. 23 23 }}} 24 24 25 25 == Amy == … … 31 31 - Updating the HET blog (posting when I have information and going through comments) 32 32 - CCAS insulation/radiant barrier (in testing/proposal phase) 33 - Automation and maintenance of PV image analysis (writing software for mirror team to eventually use)33 - Changing PV analysis over to points on Sphere. 34 34 - Ubuntu Science Support 35 35 - Interim Resident Astronomer 36 36 37 == Emily ==37 {{{#!== Emily == 38 38 - Continue to updated TO manual as needed. (Finished for now) 39 39 - Continue to update OPS manual as needed. (Finished for now) … … 47 47 - Update message on warning sign for dome entry. (Finished.2017) 48 48 - Emergency Shut down on telescope for RA. (Text finished. Will be adding images for additional information) 49 - GOES16 long term visual. (Initial stages) 49 - GOES16 long term visual. (Initial stages) }}}