Changes between Version 40 and Version 41 of NightOperations/TOProjects


Ignore:
Timestamp:
Oct 8, 2018 12:55:58 AM (6 years ago)
Author:
justenp
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NightOperations/TOProjects

    v40 v41  
    66[[BR]]
    77
    8 == Chevo ==
     8{{{#!== Chevo ==
    99- Optics Team laptop and SCS hardware interface - ongoing.
    1010- CCAS POV camera project - ongoing.
     
    2121- Remote activate and control DIMM louvers and Shutter.
    2222- Remote control Dome enclosure Louvers.
    23 
     23}}}
    2424
    2525== Amy ==
     
    3131- Updating the HET blog (posting when I have information and going through comments)
    3232- CCAS insulation/radiant barrier (in testing/proposal phase)
    33 - Automation and maintenance of PV image analysis (writing software for mirror team to eventually use)
     33- Changing PV analysis over to points on Sphere.
    3434- Ubuntu Science Support
    3535- Interim Resident Astronomer
    3636
    37 == Emily ==
     37{{{#!== Emily ==
    3838- Continue to updated TO manual as needed. (Finished for now)
    3939- Continue to update OPS manual as needed. (Finished for now)
     
    4747- Update message on warning sign for dome entry. (Finished.2017)
    4848- Emergency Shut down on telescope for RA. (Text finished. Will be adding images for additional information)
    49 - GOES16 long term visual.  (Initial stages)   
     49- GOES16 long term visual.  (Initial stages)    }}}