wiki:NightOperations/TOProjects

Version 42 (modified by justenp, 6 years ago) (diff)

--

TO Projects

Note that most projects should be commissioning related at the present time.


{{{#!

Chevo

  • Optics Team laptop and SCS hardware interface - ongoing.
  • CCAS POV camera project - ongoing.
  • Video Server upgrade and repairs - ongoing.
  • Video cameras for in dome VSS research. - ongoing.
  • Video Production - Ongoing as needed.
  • Research for Spectrograph Room lighting upgrade. - ongoing.
  • Zoom video conference install in control room. - finished.
  • Microphone install for Zoom video conference. - finished.
  • Seating upgrade to control room. - finished.
  • Seating upgrade for LER. - finished.

Ideas

  • Remote activate and control DIMM louvers and Shutter.
  • Remote control Dome enclosure Louvers.

}}}

Amy

  • TO report functions (input from other TOs welcome)
  • Metrics data miner

Justen

  • DIMM - Maintenance of DIMM system
  • Updating the HET blog (posting when I have information and going through comments)
  • CCAS insulation/radiant barrier (in testing/proposal phase)
  • Changing PV analysis over to points on Sphere.
  • Ubuntu Science Support
  • Interim Resident Astronomer

{{{#!== Emily ==

  • Continue to updated TO manual as needed. (Finished for now)
  • Continue to update OPS manual as needed. (Finished for now)
  • Gather metrics for reviews. (Finished for 2017 - 2018)
  • Overlap metrics for reviews. (Finsihed for 2017 - 2018)
  • Photograph interior of VIRUS spectrographs to track signs of wear on fibers. (Ongoing)
  • Gather RSE/HEFI post observing metrics. (Finished for 2017 - 2018)
  • Clean AZ coil. (Ongoing. Last completed March 2018)
  • Assist Justen with CCAS insulation/radiant barrier.
  • Probe Position Data. (Finished. 2017)
  • Update message on warning sign for dome entry. (Finished.2017)
  • Emergency Shut down on telescope for RA. (Text finished. Will be adding images for additional information)
  • GOES16 long term visual. (Initial stages) }}}