Changes between Version 5 and Version 6 of TOManual/stack2
- Timestamp:
- Dec 22, 2018 11:24:21 AM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
TOManual/stack2
v5 v6 34 34 8) Once you're finished with the iterations, press the image sequence button on HEFI (leave light in and on low). In the window that pops up, change the name of the sequence to sequenceX where X is the number of the stack (e.g. sequence2 for the second stack, etc.). Then change the number in the start box to 1, count to 30, and delay to 2. Press start and wait for the window to say 'IDLE'. 35 35 36 9) Once the sequence window says 'IDLE' take out the HEFI mirror and turn off the light. Then go over to the wavescope terminal. Put in 'Hanshin 30' and watch the numbers as they ouput onto the screen to make sure they're good. The script will automatically open the AOA reference and HET shutters. When the AOA shutter is open the numbers should be between 140 and 150 and the AOAnumbers should be around 180.36 9) Once the sequence window says 'IDLE' take out the HEFI mirror and turn off the light. Then go over to the wavescope terminal. Put in 'Hanshin 30' and watch the numbers as they ouput onto the screen to make sure they're good. The script will automatically open the AOA reference and HET shutters. When the AOA shutter is open the numbers should be between 140 and 150 and the HET numbers should be around 180. 37 37 38 38 10) Turn off the HEFI light source, close the CCAS shutter, move HEFI mirror OUT and 39 39 select Video Channel 7, which displays the CCAM (Chevo-CAM) alongside the text version of the local weather on the large overhead video screen. The HEFI light is pretty expensive, so turning it off as soon as you do not need it is pretty important. 40 40 41 42 41 11) Inform the RA you are now ready for a science target.